skip to content | Accessibility Information

Session6:
Here is it! !The material works really well. However, not many people wanna step on those sheets ( although they did look at them and think about what happened here). Maybe we need to do something to explain our idea.

Thanks to everyone in Event 6! It is a really good experience in school!!
Posted 14 May 2014 16:07
Session 6:
It is the final session of the event. We are installing our design.
Posted 14 May 2014 15:58
Session 5:
We got our material today and ready for installation of our proposal. We measured and cut the reflective sheet to make sure whether we got enough materials and also decided on how to compose the sheets. Last but not least, we found the right way to stick those sheets after testing in several ways.
Posted 14 May 2014 15:46
Session 4:
Unfortunately, we are not able to use the tram station site and the new site will be on the 8th floor in Chatham Building. At the end of this session, we bought our material via eBay. The next thing we do is waiting, waiting for the materials being dispatched :D
Posted 14 May 2014 15:37
Session3:
Presenting the proposals to collaborators by groups and discussing on proposals about what to change after receiving feedback from collaborators.
Posted 7 May 2014 00:24
Session 2:
Working on the A1 proposal sheet, including: a Photoshop illustration, hand drawing diagrams, materials uses and the estimated cost etc.
Posted 7 May 2014 00:23
Session 1:
Separated people into four small groups and discussing possible ideas.

We (members of Group 4) found that there is not many people notice the space itself, especially the wonderful ceiling above and they always rush to get on trams.

So we decided to do something highlighting as well as appreciating the ceiling (structure) of the space to make people “wait” a minutes to look around the space that they passed by everyday.
Posted 7 May 2014 00:21
Session 1:
Site visit at Manchester Piccadilly and be given a brief about the event on different aspects, like what the aim is, how it gonna work in these event weeks and also the consideration on safety and budget etc.
Posted 7 May 2014 00:19