skip to content | Accessibility Information

Final presentations with John from Croft Goode. He really enjoyed the designs and presentations and encouraged the students to continue looking into disaster response architecture.
Posted 16 May 2014 12:11
Piling on the bricks. This prototype at scale 1:5 held 12 bricks. That's equivalent to almost a whole family of 5. Impressive.
Posted 14 May 2014 15:31
Tense moments at Sale water park today... but they all floated- great success!
Posted 14 May 2014 15:30
Team 'Flaus' with their model. Lovely day at Sale water park for testing.
Posted 14 May 2014 15:26
Nice bit of welding by Dan. Frame is looking great. Lets hope it floats!
Posted 12 May 2014 18:42
Tubes stacked in the metal workshop ready to file and weld into a frame.
Posted 9 May 2014 18:06
Metal tubes ready for filing and welding for the frame of the floating structure.
Posted 9 May 2014 17:59
Dan and Nick working on their floating prototype model. Lots of filing of metal tubes for the frame which will then be welded together.
Posted 9 May 2014 17:57
Andy Cameron from the Environment Agency giving feedback on the designs for floating structures. Here he is speaking to the 'Flaus' group about their ideas.
Posted 7 May 2014 14:47
Andy Cameron from the Environment Agency speaking about the risks and impacts of flooding. Very informative presentation which hit home about how real the dangers are!
Posted 7 May 2014 14:45
Friday session- three groups presented their design ideas and precedents for floating structures. Great ideas about materials, details and practicalities for structures used in flood-risk areas.
Posted 6 May 2014 22:41