skip to content | Accessibility Information

Team Flaus and their anchored shed design.
Posted 14 May 2014 23:43
The floating house boat managed to carry 6 bricks before it started to tip. Pretty impressive!
Posted 14 May 2014 23:12
Testing time! This model basically survived a road accident and STILL managed to carry all those bricks! Hurrah.
Posted 14 May 2014 23:09
Just in case. A certified saver of lives was on hand.
Posted 14 May 2014 23:05
Dry run. Waiting to be tested.
Posted 14 May 2014 23:04
Each design had a completely different approach to the brief. This design used inflatable plastic pouches.
Posted 14 May 2014 23:02
The essentials. Laptop, sketchbooks, coffee and snacks. Designs are finalised ready for testing next week.
Posted 11 May 2014 10:32
Filing down the metal structure ready to be welded next week.
Posted 10 May 2014 22:52
Workshop Day 1. Groups are preparing to make their structures. Materials include, metal, wood, perspex, polystyrene and foam.
Posted 10 May 2014 22:51
Studio 712 (our studio room) has no external door handle. This proved a little difficult when outside the room and the door was shut.
Posted 8 May 2014 00:24
Our collaborator wasn’t able to make it for the first day, but he sent over a video message…. Thanks John!
Posted 7 May 2014 13:12