skip to content | Accessibility Information

Final day. Exhibiting the work produced, in all saints park. Photos hung upon the string washing line. All Members of the group gave work in order to create the outdoor gallery of the events weeks work.
Posted 15 May 2014 11:48
Planter constructed on the Business school area from the reclaimed materials. Site chosen due to the materials being synthetic/ man made much like the business school site. The Planter was also designed to allow as much sunlight into the 3 different areas. Using the idea from old studio spaces and simply reversing gives this result.
Posted 15 May 2014 11:44
Finding forgotten material in Manchester. clothes horse, venetian blind and hoover pieces, found in fallowfield.
Posted 15 May 2014 11:39
micro-modelling. uses small figures to create detailed little scenes
Posted 15 May 2014 11:38
Day 2, Repairing with Lego. All saints planter. Missing brick replaced.
Posted 7 May 2014 16:47
Old crane pit from the stalled site of a block of flats. Re-appropriated basement as a public car park.
Posted 7 May 2014 16:08