Group 09 { Community Art Project }
Design and build a community installation // Model making
Atelier: Intimate Cities
//Sketch showing seating plan, incorporating people for scale, with an exaggeration of the curvature of the design.
Posted 9 May 2014 10:16
Results// Presenting our final design plan, showing the precedents behind our playful program!
Posted 9 May 2014 10:14
Part of the proposed structure showing how the site will be occupied and the materials that will be used.
Posted 8 May 2014 22:15
Night perspective of proposal.
Posted 8 May 2014 18:36
Sitting area (proposal for New Charter Housing Group)
Posted 8 May 2014 17:14
Making a 1:20 model in time for the design proposal with New Charter Housing Association tomorrow.
Posted 8 May 2014 16:17
Sketching the perspectives of the sheltered areas of the structure where people can sit and store their bikes. The structure will be made out of timber planks and steel.
Posted 8 May 2014 16:08
Making a 1:20 Sectional Model of the Pavilion.
Posted 8 May 2014 15:59
Herb box; the community would be able to grow its own herbs; this is one aspect of embedding sustainability in the project.
Posted 8 May 2014 11:07
Materiality; using different material in the proposal. Stone and timber
Posted 8 May 2014 11:06
A semi-enclosed seating area; the idea is to make a fluid design,
Posted 8 May 2014 11:04
proposal for children playing area; Secure by design
Posted 8 May 2014 11:03
Sustainability; reusing materials on the site. The steel posts could be used in the proposal design.
Posted 8 May 2014 10:56
Material on the site which could be used in the project. (reusing off-cut timber)
Posted 8 May 2014 10:54
Site visit;different view of the site.
Posted 8 May 2014 10:53
Site visit; a very long and narrow area (200m x 3m) to design a community space. The area is next to the rail track.
Posted 8 May 2014 10:49
First Perspective of our new proposal for New Charter Housing Group. Enclosed playing area.
Posted 7 May 2014 21:29
My sketches for the structure
Posted 7 May 2014 19:04
Designing for New Charter//Perspective//Night view//Lighting :D
Posted 7 May 2014 13:08
Session 3:
Group 2 presentation.
The purpose of this presentation was to get feedback in order to develop further their schemes and get ready for the meeting with the client. The client then will choose one scheme and the groups will be combined to work together for better output.
Posted 7 May 2014 12:42
Session 3:
Group 1 presentation to coordinators.
Students were divided into groups to present their initial proposals. Students were given feedback on how to develop their initial proposals and designs for the meeting with the client.
Posted 7 May 2014 12:37
Day 1 - Meeting with New Charter Housing Group Director who gave us the brief for our project. We later visited our site.
Posted 7 May 2014 11:18
Presenting our ideas to the 5th year students. Hope to impress New Charter on Friday. Fingers crossed XD
Posted 7 May 2014 11:11
30.04.14//First meeting with New Charter. :)
Posted 7 May 2014 11:05
Upon visiting the site in Ashton Under Lyne, we had to create an intriguing structure that would be available for the public and nearby residents to use.
Posted 6 May 2014 21:50
Session 2: Today we met with the students to discuss their initial design proposals after our meeting with the client and visit of our site.
Posted 6 May 2014 21:27
Second meeting with the students to discuss initial ideas and proposals for the scheme. Group meetings into two different groups.
Posted 6 May 2014 21:23
Initial sketch of proposal
Posted 6 May 2014 15:12
Precedent study is Miilu by Sami Rintala.
Posted 6 May 2014 12:21
This is my south elevation of the groups' proposed design which stretches over the landscape with plays areas, benches, bike storage and more.
Posted 6 May 2014 12:06
We visited Aston Under Lyne where we had to design a sculpture as a group which will be built across the landscape of the proposed site.
Posted 6 May 2014 12:02