skip to content | Accessibility Information

Jinxia decided after a glass of cava it would be a fun idea to play human hammock swing
Posted 15 May 2014 11:59
The final structure in place. Hope this serves the clients needs for years to come!
Posted 15 May 2014 11:58
On site the structure starts to take shape while shifty Arjun peeps from the bushes!
Posted 15 May 2014 11:54
FINAL MODEL ASSEMBLY. THIS WAS THE CHOSEN DESIGN AND IT WAS DRY TESTED BEFORE BEING BOLTED TOGETHER ON SITE.
Posted 14 May 2014 09:01
THE FINAL MODEL IN SKETCH UP WITH ROOF
Posted 14 May 2014 08:57
Rearranging pallets to inform our micro-home design
Posted 7 May 2014 14:37