skip to content | Accessibility Information

Let's open the champagne, we finished!
Posted 16 May 2014 14:33
After unloading everything, we started constructing our shelter.
Posted 16 May 2014 14:32
One of the coolest parts of the day was taking a ride to the site in our moving van.
Posted 16 May 2014 14:30
Final day – loading everything on the van
Posted 16 May 2014 14:25
Site clearing – we can finally envision the shelter being constructed.
Posted 16 May 2014 14:24
We finalized the design and thought of all the extra materials we will need.
Posted 11 May 2014 15:37
We tried out different possibilities for constructing the shelter using the chosen design as a base.
Posted 11 May 2014 15:35
We developed our ideas in groups of 3 and the client chose her favourite.
Posted 11 May 2014 15:27
Day 1: we met our client while visiting the site and she told us her requirements for the shelter we were going to build. For day 2 we had to come up with a design which incorporates a shelter, a sitting place and maybe space to put a hammock and a BBQ in.
Posted 11 May 2014 15:26