Last Day - Presentation with John from croft Goode
Our group's presentation board. :)
Posted 16 May 2014 13:38
We meet up to do our presentation sheets before the day of presentation.
Posted 16 May 2014 13:35
Day 6- Water Sale Park
Our model failed. It can only carry 6 bricks which was supposed to be 14 bricks.
Posted 16 May 2014 13:32
Day 6 - Water Sale Park
Our 1: 5 model is ready !!!!!
Posted 16 May 2014 13:25
Day 6 - Water Sale Park
We inflate the air bags and assembly walls on site.
Posted 16 May 2014 13:22
Day 5 - workshop
Our foldable 1: 5 model works !!!!!! Air bag is ready at the bottom of the base.
Posted 16 May 2014 13:12
Day 5 - workshop
We stick the pieces up. But, UHU glue didn't work with the blue Styrofoam, so we sand Styrofoam to remove the sticky UHU glue on it. After that , we decided to use double sided to stick them up.
Posted 16 May 2014 13:03
Day 4 - workshop
We found a alternative to tie the panels up other than dig a whole
in the styrofoam, which is stick those small pieces on the right of the photo at the bottom of the base.
Posted 16 May 2014 12:55
Day 4 - workshop
Our group model is roughly looks like that. Styrofoam is chosen to ensure it float.
Posted 16 May 2014 12:45
day 4 - workshop
We works as a group. :)
Posted 16 May 2014 12:35
Day 4 - Workshop
This is what our group did in first day of workshop. We had cut all pieces out and just wait for air bag to arrive.
Posted 16 May 2014 12:27
Day 3 - Andy visit. He was giving some feedback about our design to us.
Posted 16 May 2014 12:20
Day 2 - After discussion with a group, finally we came out with a concept, inflatable boat .
Posted 16 May 2014 12:13