Day 6. Installation day, here is the process of installing our design which is all about admiring reflections & light from a real life third dimensional perspective whilst waiting for the elevator, the material worked really well although the effect got people looking at the sheets,they did not however tread on them which was the desired effect..maybe they just appreciate hard work!!
Posted 14 May 2014 11:46
Day 5. Today we started preparing for the installation of our design, measuring and cutting the sheeting early, ensuring we have enough material and also that it works according to our original plan.
Posted 14 May 2014 09:15
Day 4. We got the unfortunate news from the collaborators that we will not be using the tram station due to a time delay over permission to use the site…so we will now install our designs on student campus, we also purchased our material via ebay.
Posted 14 May 2014 09:03
Day three the proposal, here we are presenting our design plan to collaborators from the network rail. it was a little nerve racking but fun all the same. Feedback from the collaborators was very useful
Posted 7 May 2014 12:06
Day two, the final proposal for network rail, the idea of the design is to reflect light, but its main purpose is to draw attention to the existing architecture, as commuters transit through the space the special tape acts as a mirroring 3D flooring.
Posted 7 May 2014 12:00
Day two..Waiting..here we are busy designing the final proposal for the tram line at piccadilly station. We searched online for materials and different techniques, here I'm editing our final perspective image, whilst my team members finalise hand drawings to be photo edited.
Posted 7 May 2014 11:53
Day one of events programme, after viewing the site we came up with a design to be installed inside the tram station waiting areas which would intrigue daily commuters.
Posted 6 May 2014 22:28
Day one of events at Piccadilly tram line, discussing possible design prospects health and safety…all the good stuff!
Posted 6 May 2014 22:16