Sixth Session (Final)
-Final day of events and we installed our (9) sheets.
-It is spaced out relating to the tiles along the floor, skipping one tile per sheet.
-Unfortunately people seem to avoid stepping on the sheets, perhaps it looked quite fragile.
Posted 14 May 2014 11:38
Fifth Session
-Our material was delivered (reflective sheeting).
-Decided on the composition and scale of the sheets.
-We tested some in the space before finalising on final day.
Posted 14 May 2014 11:32
Fourth Session
-We recieved unfortunate news that we will not be able to use the tram station.
-Our new installation space will be on Chatham 8th Floor, around the 'waiting' area by the lift.
-We ordered our material on ebay.
Posted 14 May 2014 11:28
Third Session
-Presenting to Collaborator
-After feedback we worked out the plan of the installation and the process of making it
Posted 7 May 2014 16:44
Second Session
-Worked in studio to finalise concept, design, material, cost
-Produce an A1 proposal sheet for presentation next session
Posted 7 May 2014 16:42
First Session
-Visit the site (Picadilly Metrolink)
-Back in studio to start analysing the site and propose a concept to 5th years
Posted 7 May 2014 16:30