#6 Completion: the micro-shelter is successfully built after two weeks of hard work and great team effort.
Posted 15 May 2014 10:41
#5 Assembly on site: all components are delivered to site and assembled by the team.
Posted 15 May 2014 10:41
#4 Second stage of construction: building the timber bracing for the base/columns and constructing the roof structure.
Posted 15 May 2014 10:40
#3 First stage of construction: cutting the timber pallets into specific dimensions and shapes required.
Posted 15 May 2014 10:40
#2 Design Process: Visualising and improving the design through stacking of timber pallets.
Posted 15 May 2014 10:39
#1 Design Process: Critical thinking session with Jane Leach, the client to further develop the initial design.